Boiler Tube

Boiler Tube
Our boiler tubes are characterized by high temperature resistance (up to 700℃), high pressure resistance (supporting supercritical unit conditions) and excellent corrosion resistance, covering international standards such as ASME SA210 A1 and SA213 T91/T22. Suitable for power station boilers, petroleum refining, chemical equipment and other demanding scenarios. Covering carbon steel (SA106B/C), alloy steel (15CrMoG) and stainless steel (TP304H/316L), to meet the needs of all scenarios from low to medium pressure to ultra-high pressure; relying on intelligent inventory management, full-size coverage of the spot, the fastest delivery of transnational orders is 15 days, and the urgent demand can be reduced to 2 days, and through the ISO9001, CE, the European Union PED and other certificates, in line with the environmental protection standards, to help the global energy transition. Helping the global energy transition.
Product Description

Product Name

ASTM A192 seamless Carbon Steel Pipe /Boiler Tube

Material

Q195, Q235, Q345; ASTM A53 GrA,GrB; STKM11,ST37,ST52, 16Mn,etc.

Wall Thickness

0.7MM~30MM

Length

Length:Single random length/Double random length5m-14m,5.8m,6m,10m-12m,12m or as customer's actual reques

Standard

JIS G3466, EN 10219, GB/T 3094-2000, GB/T 6728-2002

Grade

Grade A, Grade B, Grade C

Section Shape

Square, Rectangular, Round,

Technique

ERW Steel Pipe

Packing

Bundle, or with all kinds of colors PVC or as your requirements

Ends

Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc.

MOQ

1 Tons, more quantity price will be lower



Surface Treatment

1. Galvanized2. PVC,Black and color painting3. Transparent oil,anti-rust oil4. According to clients requirement



Product Application:

1. Fence, greenhouse, door pipe,greenhouse2. Low pressure liquid, water, gas, oil, line pipe3. For both indoor and outdoor the building construction4. Widely used in scaffolding construction which is much cheaper and convenient

Certificates

API ISO9001-2008,BV

Delivery Time

Usually within 10-45 days after receipt of advance payment

Product Show

Packaging And Transport

Factory Show
Customer Visits
Inquiry
NameRequiredNameWrong Format
TelRequiredTelWrong Format
EmailRequiredEmailWrong Format
MessageRequired
Related Products

Copyright © SHANDONG SHENGQIANG IRON AND STEEL CO.,LTD. Rights Reserved